Update on the Littlehampton Ferry.

Littlehampton Ferry

I previously reported that it was doubtful that Littlehampton’s Ferry would be running this year. I understood (wrongly as it turned out..) that this was owing to the lack of suitable pontoon space and landing area. The original pontoon having been removed to facilitate the construction of Littlehampton’s Flood defences.

However, I now have it on good authority that the Environment Agency’s Contractors – VolkerStevin were very concerned to hear that their construction works would potentially hamper the running of Littlehampton’s Ferry. Consequently they’ve now offered to provide a suitable pontoon area and landing area from which the ferry could operate from.

I understand that this offer has been declined.

Full credit must be given to VolkerStevin for coming up with this offer and making every attempt to facilitate the operation of our ferry.

But why isn’t the Littlehampton ferry going to run this year?

My understanding is that the ferry has never actually made any money and was in a loss making situation. No surprises here as the reason the original ferry operation was discontinued is a result of ongoing losses.

Some years ago when I was running the Oyster Pond boating lake on behalf of Arun District Council I looked into re-launching the Littlehampton Ferry. At that time I undertook a feasibility study, which included talking with the previous ferry’s operators – Littlehampton Harbour board and I couldn’t see how the ferry could be made to work without substantial public subsidies.

Whatever the reasons for the non-operation of the Littlehampton ferry, it’s important to clarify that the non-operation is not as a result of the construction of Littlehampton’s Sea Defences. And, every effort has been made by the Environment Agency’s Sea Defence Contractor, VolkerStevin to accommodate it, should it be re-instated.

Remember to keep up to date with all the latest news from the Pier Road Diaries, just sign up to regular blog updates by entering your email address in the top right hand side of this page. You can also follow Pier Road on twitter – @Pier_road

As always, thanks for reading and do feel free to add your own views below.

Littlehampton’s Action Boat will not be running this Season.

Sad news – No Action Boat for this coming Season.

Action Boat

Earlier this week I caught up with the guys behind Littlehampton’s popular white-knuckle powerboat rides –  Action Boat  They confirm that owing to the Sea Defence works they won’t be able to run their popular rides this season.

Apparently the problems with access to and from the boat are just too great now that Action Boat’s berthing pontoon has been removed while the sea defence works are underway. They are hopeful that they’ll be back again in action in 2015. But this is a big blow for Littlehampton as this was one of our newest and most popular waterside attractions.

And it’s not just Action Boats that will be affected by lack of pontoon space.

One of the biggest problems facing Littlehampton Harbour this year will be the lack of visitor berthing space for visiting boats.

Littlehampton harbour 8

Last year we enjoyed  a bumper season with visiting yachts many of them arriving as part of ‘Rallies’.

These boats and rallies bring a very welcomed spend to our local businesses – restaurants, shops and bars doing exceptionally well. Each year my own bike shop in Pier Road does well with cycle hire with visiting mariners and we also manage to sell a number of bikes to them.

But with the restricted pontoon space, it’s difficult to see how they’ll all fit in.

And, sadly  the future of the Littlehampton Ferry also looks to be in doubt.

Littlehampton Ferry

Latest update I can get on the Littlehampton Ferry is that the boat is up for sale and the previous operator (Action Boats) has confirmed it won’t be running the ferry as part of their operation.

Again even if a buyer is found it’s difficult to see where a suitable embarking and landing pontoon would be found as the original pontoon has now been removed as has the steps leading to it.

No doubt it’s going to be a difficult season for us as we’ve lost these two very popular attractions.

Please Note  – if you’ve previously signed up to receive regular updates via email from the Pier Road Diaries, we need you to re-sign up again as the blog has now moved servers and the original database has been deleted. (an oversight on my part).

So, please do sign up again – you’ll find the sign up toward the top right hand side of this page.

Don’t forget also to follow Pier Road on Twitter – @Pier_Road

As always, thanks for reading and for following us.